Owed ledger

Live - fetched 2026-10-14 02:30 UTC-generated 2026-10-14 02:30 UTC
HandshakesFull graph
Domain perspective
All domainsplatformgrowthsalesdeliveryrevenuecoachingfinanceportfolio
Pending
1
Replies owed
3
Conditional
5
Completed
27

Pending

platform (1)
-P2MplatformAuthor the person.contact.updated payload schema and registry entry and emit it from updatePersonContact, fanout restricted to entitled consumersmemo

Replies owed

indexer-derived from thread structure
REPLYP2salesto growthHeads-up to Sales; the credit-reservation-lock v3 ack memo has a commitment deadline validation error that is blocking the shared indexermemo
REPLYP2platformto growthADR-0061 Growth acceptance and authorized web workspace handoffmemo
REPLYP2growthto portfolioPortfolio accepts ADR-0061 and inventories compatibility and reporting continuitymemo

Conditional

waiting on a gate
-P1M
3 blocking
growthActivate Growth origin compatibility and acquisition settings and verify approved inquiry attribution end to endmemo
-P1L
2 blocking
platformActivate new Platform authentication and shared service routing after domain acceptance and readinessmemo
-P1XS
2 blocking
portfolioVerify Portfolio on its new HTTPS hostname and publish activation evidencememo
-P2M
1 blocking
salesBuild the Sales subscriber that applies Platform-originated contact-change events to LeadIntakeSnapshot phone and emailmemo
-P1S
1 blocking
portfolioVerify Portfolio runtime compatibility and publish deployment and rollback evidencememo

Completed

audit trail of what shipped
P1SplatformHold the next @sguild/dispatcher registry freshness publish until the response window closes, then either publish the refreshed package or file the follow-up release plan with any domain-specific blockers named.memo
P2SplatformADR-0009 amendment landing Revenue's co-authored Producer transactional guarantee insertion under Trade-off Analysis, with bold-header Date bumpedmemo
P2LplatformWarehouse semantic-layer dbt model for growth.touchpoint; one sprint of Platform workmemo
P3XSplatformintake.captured v2 payload schema registry entry; few hours of Platform workmemo
P1Splatformexternal-actions ADR accepted (Platform stewards as cross-domain infrastructure: one queue, multiple producers, retry classification owned by Platform alongside the dispatcher); ADR carries the producer-side surface that consumers call into and the queue-side guarantees Platform commits to maintainingmemo
P2SplatformBuild /schema endpoint factory + per-section /schema routes per §11.3 (gates §12 acceptance for every section)memo
P2SplatformWire Coaching cost trio compute (coach_cost_per_hour, coach_cost_per_completed_lesson, coach_compensation_total) against the silver rate-column extension Coaching shipped 2026-05-19memo
P2MplatformBuild refresh scheduler: a worker that walks the registry, checks last_successful_refresh_at against max_staleness_minutes, triggers compute for stale metrics independent of pull trafficmemo
P2MplatformWire /corrections write-side detection: recompute-prior-period diff against snapshot in each compute*Metrics function, emit correction event via recordCorrection()memo
P3SplatformSurface upstream_unavailable detection on /health endpoint (currently always returns empty array)memo
P2SplatformWire ad_spend_reconciled cross-warehouse compute in lib/mart/sections/revenue.ts against Growth's campaign_spend_daily silvermemo
P2SplatformWire revenue_concentration top-10 × 52-week window per Revenue's 2026-05-19 decisionmemo
P2MplatformWire Coaching utilization metrics (coach_capacity_hours, coach_scheduled_hours, coach_completed_hours, coach_idle_hours, coach_utilization_scheduled, coach_utilization_completed) against availability_template + lesson_booking per Coaching's documented derivationmemo
P2MplatformWire Delivery metrics (lesson_no_show_count, lesson_reschedule_count, dormant_student_count, churn_post_lock_count) against the schema columns Delivery shipped todaymemo
P2MplatformWire Sales cohort triangle (4 metrics) as entity_rows against sales.lead + sales.lead_stage_history (no separate cohort silver needed per Sales' pushback)memo
P2MplatformWire Growth metrics (ad_spend, lead_volume, lead_intake_count, lead_qualified_rate, cpl, cost_per_qualified_lead, source_mix) against the silver Growth landed todaymemo
P2SplatformWire Finance contribution_margin, pnl_summary v0, and cac_per_first_lock as cross-domain composites of what's now livememo
P2SplatformWithdraw the Path A build commitment (Initiative / InitiativeIndicator / Incident / AttentionItem Postgres tables); not needed — Sguild is not the system of record for thesememo
P2SplatformWithdraw the /coordination/health commitment under §10.3 framing; if Sguild builds a health endpoint later for engineering-coordination purposes, that is a separate project and not part of the mart contractmemo
P1SgrowthDeploy the Growth lead.intake.renewed migration and consumer through the gated production rollout, run the live health check, and publish zero-mismatch lag evidence before Sales enables renewed routingmemo
P1SgrowthDeploy the Growth schema migration, seed the verified Meta form mappings, enable intake.captured v3, and run the mapped Meta canary and post-deploy auditmemo
P1SgrowthDeploy backward-compatible Growth intake origin preparation and publish activation and rollback evidencememo
P1SgrowthPublish concrete web implementation and acquisition migration handoff within Growth workspace boundariesmemo
P1MgrowthDeploy host-aware umbrella and swim routes in the explicitly authorized web workspacememo
P0MgrowthPublish Growth disabled deployment and qualification readiness evidence for Meta CRM feedbackmemo
P0MgrowthPublish Growth paid feedback activation evidence for exact onboarding settlementmemo
P1LplatformPrepare Platform and Coordination domain compatibility and publish exact DNS and activation prerequisitesmemo